Hello Everyone!
Sorry we’re late but we have been very, very busy!
We’ve barely had a moments break. So much has changed since our last newsletter.
Outside the factory extensive groundworks have been carried out, including excavating trenches, laying concrete bases and much more. All to connect Dragonfly’s utilities.
A new substation. Has been installed.
Gas tanks have been delivered.
Waste water drains connect the factory to Dragonfly’s new treatment plant.
And that’s just the outside, not to mention the work going on inside.


Let’s take a peek inside.
Hereto progress has been swift.
Lights have been installed and Aco drains laid.
A hand laid concrete layer, followed by a hand laid resin layer to complete a floor with the perfect fall.
And on top of all this the extensive pipework is well underway. All this in one month!


We would really like to thank all those who have worked tirelessly on this project thus far. Dave and his team from Coldstore Construcion and Richard and Adam and their team from APS.


That’s all for now folks. More to come next month. We hope that you are as excited as we are at the progress we have made in such a short time.